How to Compare Home Addition Quotes and Scopes

Put the scope beside the price before ranking proposals. Two addition quotes may describe different drawings, different existing-house work or different finish assumptions. A lower total does not tell you which rooms, connections and obligations it covers. A comparison becomes useful when those differences are written in the same format.

This workbook gives you a side-by-side method and a question log. It is for clarifying what each proposal means, rather than predicting a final price or evaluating a company from unsupported claims. Use the Home Addition Cost page for the broader budget discussion and the guide collection for preparation tools.

Timber-framed addition shell adjoining an original brick wall with a broad steel-supported opening into the house.
New timber framing and a supported opening in the existing brick wall are visible together.

Establish the common reference package

Write down the design version sent to each person preparing a proposal. List the drawing dates, room brief, specifications, selections and site information included. If one proposal used a newer layout or received extra information, record that difference before comparing totals. Ask for the effect of the same reference package to be explained; do not silently adjust a proposal yourself.

State the essential outcomes in one short paragraph: rooms gained, existing rooms changed and the intended relationship between them. The design process page explains how the proposal develops. At an early stage, the reference package may still contain unresolved choices. Make those gaps explicit and ask how each proposal treats them.

Build a side-by-side scope record

Use included, excluded, allowance, assumed and unclear as separate statuses. Quote the relevant short scope description in your own private comparison and retain the original proposal. A blank cell is a question, not evidence that the work is included. Add a third proposal only if it can be reviewed against the same reference package.

Scroll sideways to see every column.

Quote comparison template — replace entries with each written proposal’s wording
Scope headingProposal AProposal BQuestion to resolve
Reference documentsRecord drawing version, brief and specifications.Record drawing version, brief and specifications.Are both based on the same information?
New constructionRecord footprint, foundation, structure, roof and enclosure scope.Record footprint, foundation, structure, roof and enclosure scope.Are construction boundaries and unknowns described consistently?
Existing roomsRecord affected rooms, openings, alterations and finish repairs.Record affected rooms, openings, alterations and finish repairs.Is the same existing-house work included?
SystemsRecord plumbing, electrical, ventilation and heating/cooling assumptions.Record plumbing, electrical, ventilation and heating/cooling assumptions.Who confirms capacity, routing and associated making good?
SelectionsRecord named products, allowances and undecided items.Record named products, allowances and undecided items.Do the product and installation assumptions match?
Professional and approval workRecord included tasks, exclusions and responsible parties.Record included tasks, exclusions and responsible parties.Which required outputs remain outside each proposal?
Site and temporary workRecord access, protection, removal and reinstatement.Record access, protection, removal and reinstatement.Are preparation and completion boundaries equivalent?

Read existing-house work and selections as separate scopes

The connection to the original house deserves its own comparison. Identify wall openings, possible stairs, changes to floor levels, relocated doors and finish work around the junction. Ask what happens to ceilings, flooring and cabinetry in affected rooms. Do not assume that a proposal for the new room includes every consequence in the room it connects to.

Then compare selections. A named product, a general finish description and an allowance are different assumptions. Ask what the allowance covers, whether installation is included in the relevant line and how later selections would change the amount. Keep the integration of old and new visible in the comparison: matching or deliberately transitioning materials, room proportions and finish continuity should be described where they matter.

Steel-supported opening from a finished living room into a framed addition with a protected floor route.
A broad supported opening joins retained room finishes to the framed work area.
Oak and cream kitchen cabinetry with a sink, range and four plain finish samples on a timber table.
Simple cabinetry and unmarked wood, tile and counter samples in a household kitchen.

Use the rooms as a completeness check

New rooms delivered

For each new room, trace the scope from enclosure to use. Include the intended fixed fittings, service needs and connection to adjacent rooms. This is a review prompt, not a technical specification.

  • Room outcome State what the finished room must support: dining, sleeping, bathing, working or relaxing. Ask which drawings and selections define that outcome in each proposal.
  • Supporting space Review stairs, halls, storage and utility areas that make the main room usable. Confirm they are part of the same scope rather than implied by the headline room count.

Existing rooms completed

Walk the original house on the reference plan and highlight each affected room. Review repairs and changes at each location, including spaces touched by services or circulation.

  • Retained features Record what is intended to stay and what protection or making good is described. Ask how an unexpected condition affecting retention would be handled.
  • Reconfigured spaces Review changed kitchens, bathrooms and shared rooms explicitly. Use addition and whole-home renovation planning when the proposal includes a wider transformation of the original house.

Compare allowances and exclusions without inventing adjustments

Make a separate allowance schedule. Record the item, the amount if stated in the actual proposal, the assumed product or quality, and the work included around it. Do not replace an allowance with your own guessed amount to make a total look comparable. Ask for clarification or a revised proposal based on a common selection assumption. Keep the response with its date and proposal version.

List exclusions in a second schedule. Some may be deliberate homeowner responsibilities; others may be unresolved scope. Ask what would be required to complete the room if the excluded work is necessary, who would arrange it and how it interfaces with included work. An exclusion is not automatically a flaw, but it must remain visible when you compare the total household commitment.

Check the work that can disappear between headings

These questions do not prescribe a construction method. Ask the proposer to describe their scope and responsibility for the actual design. If an item is outside the agreement, record its interface with included work. Unclear boundaries are especially important where several people would need to coordinate the same connection or service change.

Scroll sideways to see every column.

Omitted-work questions to review with each proposal
GroupAsk whether the scope addresses
Opening and connectionExisting-wall work, appropriate investigations, temporary measures and finish completion around the junction.
Exterior completionRoof and wall junctions, windows and doors, material transitions and affected existing surfaces.
Services through existing roomsRoutes, capacity review, alterations, fixtures and repairs to disturbed finishes.
Site access and protectionThe intended access route, household separation, retained garden features and storage arrangements.
Removal and reinstatementRemoval of affected elements, debris handling and the condition of paths, planting or surfaces at completion.
Decisions and documentationSelection dates, professional outputs, approval responsibilities and how revisions will be recorded.

Treat unknown conditions as a written question

Look for assumptions about existing construction, hidden conditions, ground information and retained systems. Ask what information the proposal relied on and what investigation is included. Record when an unknown would be assessed, who would advise on the response and how a scope or price change would be documented. Do not expect a comparison worksheet to resolve concealed conditions.

Transfer useful questions from the budget scope worksheet into this log. That worksheet separates optional choices from unresolved requirements. Keep the same distinction here: selecting another finish is different from discovering that a connection needs a changed design. Both can affect the proposal, but they need different decisions and evidence.

Ask about programme, disruption and payments in the same way

For each proposal, ask which assumptions support the proposed programme: design readiness, approvals, selections, access, product availability and other dependencies. Discuss expected periods when current rooms may be unavailable and what temporary household arrangements require planning. Record the answers as proposal-specific information rather than inferring a timetable from the physical size of the addition.

Ask for the payment schedule, the event or deliverable associated with each payment, and the method for documenting variations. Compare the wording and responsibilities in the actual proposed agreement. Where a contractual question needs independent advice, note it as a separate action. A clear explanation of payments and changes belongs beside the scope, not in a mental note after the total has been chosen.

Two closed plain project folders, an empty checklist and three material samples on a timber dining table.
Blank project folders and an unfilled checklist sit beside wood, tile and counter samples.

Keep a clarification log until the comparison is fair

Prioritize questions that could change the household outcome or materially change the scope. Group smaller finish questions so the discussion stays usable. When a response changes the proposal, request a clear current document rather than relying on a chain of informal notes. Keep the revised reference package aligned with the revised comparison.

Scroll sideways to see every column.

Question log for unresolved proposal differences
EntryWhat to write
Scope referenceThe room, drawing, specification or proposal section concerned.
DifferenceThe actual mismatch, exclusion, allowance or unclear statement.
Common questionThe same practical question sent to each relevant proposer.
Written responseAnswer, date, source and any revised proposal version.
Effect on comparisonWhether the scope is now equivalent, deliberately different or still unresolved.
Homeowner decisionThe choice or further information needed before selecting a proposal.

Rank only the proposals you can explain

When the significant questions are answered, write a short explanation of the remaining differences. One proposal may deliberately include more existing-house work, different selections or a different responsibility boundary. Keep those differences visible beside the price rather than forcing an artificial like-for-like total. Decide whether the difference serves an essential household outcome or an optional preference.

If the design remains too open for a meaningful comparison, the next useful action may be to resolve it. A comparison can correctly conclude “further design or investigation needed.” That is a better decision record than choosing a number whose scope you cannot explain. Retain the common brief, room ledger and clarification log as the basis for the next proposal version.

Questions while using this worksheet

Should I select the lowest quote once the totals are listed?

First establish what each total covers and which assumptions remain open. Consider the actual scope, responsibility, programme and agreement questions you have reviewed. The worksheet makes these differences visible; the totals alone cannot do that.

What if a proposal uses fewer details than the others?

Ask for clarification against the common reference package. Mark missing information as unclear, rather than assuming it matches the most detailed proposal. If a significant boundary remains undefined, keep that limitation beside the price.

Can I compare proposals based on different designs?

You can compare them as alternative project scopes, but you should label the design differences. They are not equivalent quotes merely because each adds a room. Review the household outcomes, existing-room changes and investigation assumptions for each.

Does a written clarification replace a revised proposal?

It can help explain an item, but ask how material changes will be incorporated into the current proposal or agreement. Keep dates and versions clear so all parties understand which scope is under consideration.

Begin with the rooms, the reference package and the questions

Use Begin Your Project with your household brief, current design information and the scope differences you need to resolve. A useful comparison begins with a shared description of the work and the decisions required to define it.