Home addition planning guide
What to Record About Yard Drainage Before an Addition
Before an addition changes the yard, make a clear record of the conditions you have already noticed. Where does the lawn stay wet? What happens near the patio or a garden door? Which visible features would move with the new footprint? Ordinary observations can help a grading professional understand the questions that deserve investigation.
This worksheet collects information without diagnosing a drainage problem or designing a remedy. The grading and drainage planning page explains current review requirements. Keep this sheet alongside the other planning guides so the new rooms and their yard consequences are considered together.

1. Start with a dated yard record
Write the address, preparation date and the areas you can observe from normal accessible positions. Give locations simple names such as rear lawn, patio edge and east side path. Use those labels on a sketch and in the photo filenames. If compass directions are uncertain, use an unambiguous description tied to the house, such as the side beside the driveway.
Record the circumstances of each observation: season, approximate date, whether there was recent rain or snowmelt, and whether you know how long the condition lasted. Distinguish what you personally observed from household memories or information supplied by someone else. A useful note might say that a wet patch was visible the next morning; it should not quietly become a claim that the area is always flooded.
You can begin without a full year of photographs. Mark the seasons or conditions you have not seen. Do not stage a water test or alter a drain to complete this sheet. The purpose is to capture available context and identify gaps for the appropriate review.
2. Photograph the house and the yard features together
Take a broad view that locates the feature in relation to the house, then a closer view where it adds useful detail. Include visible downspouts, patio edges, steps, garden doors and paths. Keep photo references stable so a question about the patio can point to one clear image. Photograph from a safe dry position in ordinary conditions rather than approaching moving water or an unstable edge.
A downspout photograph can show the visible outlet and nearby surface. A patio photograph can show its relationship to a doorway and landing. Neither image measures levels or establishes the behaviour of hidden drainage. Keep the descriptive note limited to what the picture shows, and ask what measured site information is needed to understand the proposed work.


A repeatable drainage observation sheet
Scroll sideways to see every column.
| Location or feature | Observation to record | Question for review |
|---|---|---|
| Wet area | Date, visible extent, conditions and photo reference. | What survey or assessment is needed to understand this area? |
| Downspout or outlet | Visible position and surface context; hidden route marked unknown. | How should roof water be considered with the addition? |
| Patio and garden door | Visible relationship, steps, surface edges and any remembered water entry. | Which measured levels and details are needed before redesign? |
| Side-yard route | Path, planted strip and visible low or high points as observations. | Could the new scope affect a relevant drainage or access relationship? |
| Neighbouring context | Visible features from an ordinary permitted viewpoint, with source noted. | What context should the professional review include? |
| Missing information | Unknown levels, buried services, previous plans or seasonal conditions. | Which gap could change the footprint or yard design decision? |
Observation and conclusion are different entries
Keep two columns in your notes even when the answer seems obvious. The first says what happened or what is visible. The second states the question that needs assessment. This habit prevents a preliminary homeowner account from being mistaken for a technical finding.
A wet patch
Observation: a patch remained wet after the last rainfall and appears in photograph D3. Question: what information is needed to assess its relevance to the proposed addition? Avoid assigning the cause to soil, a neighbour’s grading or a failed buried pipe from appearance alone.
A doorway or wall
Observation: water was noticed near a doorway on a particular date, or a household member remembers a past incident. Question: what records, site measurements or building assessment are useful? Preserve the distinction between an observed event and a diagnosis of the building or yard.
An apparently dry yard
Observation: the available photographs show dry surfaces on their dates. Question: what other conditions or measured information should the review consider? A lack of visible ponding in a few images is useful context, but it does not establish the future performance of a changed footprint.
3. Describe the proposed change as a yard project too
Draw the current addition outline on a copy of the available plan or a clearly labelled preliminary sketch. Beside it, list the yard changes you hope to make: a new patio, moved steps, different garden door, altered planting or a retained side path. Mark any existing features that would be covered, relocated or brought nearer to the new wall. Use “proposed” and “to be assessed” where the details are still open.
For a rear home addition, the room plan and the outdoor route are closely related. A deeper kitchen can shift the garden door and patio, while a larger family room can change how the remaining yard is used. Read how an addition changes backyard space and drainage to consider those linked decisions. Record them here without choosing finished levels or assuming a drainage solution.
Carry the observations into the broader feasibility review. The new footprint, original house, trees and access should be considered together. If agency relevance is uncertain for the property, Conservation Halton planning provides the separate screening route. A homeowner drainage sheet neither establishes agency relevance nor provides clearance.
4. Keep the side route in the picture
A side path often serves several purposes: access to the garden, movement during construction and a visible relationship between the house and neighbouring context. Photograph its full route from ordinary accessible positions. Note steps, gates, planted strips and surfaces. Where the path disappears behind a feature, mark that portion as unobserved instead of drawing a complete route from memory.
Ask how the proposed addition and associated work could affect this area. A new patio may meet the path differently; construction access may require restoration; a service route may introduce another review question. These are reasons to coordinate the scope, not to select a drain, trench or slope yourself. Keep the questions beside the current concept so they are not lost when the room layout is revised.

5. Ask the grading professional a focused set of questions
Prepare a short cover note describing the addition and the observations that could influence it. Attach available survey or grading information with its original title and date, plus the concept and selected photos. Explain whether the photographs show current conditions and whether later landscaping or building work has occurred. State clearly which levels, buried routes and past records are unknown.
- What property measurements or records are needed for this proposal?
- Which observations deserve further assessment before the footprint is chosen?
- How should the roof, patio, garden door and side route be considered together?
- What information is needed about existing drainage features and buried services?
- Which other professional or authority inputs need coordination?
- Which drawing or report should record the eventual recommendations?
Use the preparation guide to assemble the household brief and house records alongside this sheet. Ask for the next useful input rather than a complete technical answer based only on photographs. The review can then be proportionate to the decision currently being made.
Update the record when the concept changes
Keep the original observations, but add a dated note for a moved wall, new patio, changed door or revised access route. Tell the appropriate reviewer which scope has changed and ask whether earlier advice still relates to it. Do not erase a drainage question merely because it falls outside the new room; associated land work may still affect the same area.
After receiving advice, record its source, date, documents considered and outstanding actions. Separate recommendations from approval status. If a measurement or investigation replaces an assumption, update the sheet and keep the evidence reference. This provides a clearer handoff into design than an unlabelled collection of yard photographs.
Questions while completing the worksheet
Should I wait for heavy rain to make the record?
Use information you already have and ordinary observations made from safe accessible positions. You do not need to enter hazardous conditions to complete the worksheet. Note the limits of the available record and ask which additional information is useful for the professional review.
Can photographs establish the yard slope?
Photographs show relationships and visible features, but perspective can mislead. Record any existing level information from its actual source and mark unmeasured levels unknown. Ask what survey or other measured information is appropriate before a design depends on those levels.
What if I think a neighbour’s yard causes the wet area?
Describe the event and visible context without assigning responsibility or a technical cause. Record the source of any information you were given. The relevant professional review can identify what further evidence and coordination are needed for the proposed work.
Does a drainage observation sheet replace grading review?
No. It helps communicate the property context and missing information. The proposed scope determines the applicable review and technical inputs. Use the grading planning page and confirm current project requirements with the City; the sheet does not design or certify drainage performance.
Use the current requirements route
Municipal guidance context reviewed October 13, 2026. Consult grading and drainage planning and the City’s Pre-Building Approval guidance for the current project-specific route. Zoning, engineering and forestry reviews have distinct purposes. This observation guide gives no drainage diagnosis, engineering specification or approval conclusion.
Include the yard in your addition brief
Share the rooms you need, the proposed backyard changes and the drainage observations already recorded. Mention the survey or previous plans you have and the information still missing. Begin Your Project with a clear view of both the house and the remaining yard.